Home | Contact Us | Population: 35,223
City of Oak Creek

Contact Us

Inspection Department
8640 S. Howell Ave
PO Box 27
Oak Creek, WI 53154

Office Hours:
8:00am - 5:00pm (M-F)

Phone: 414-768-6547
Fax: 414-768-6589

Inspection Department Directory

Jeff Lynch
Inspection Supervisor

What is?

What is a "Plat of Survey"?
A survey of your property. If you don't have one, we may be able to provide one for you.

 

What is "Setback Information"?
The distance from the property lot line and the house to the structure you are building.

 

More Information:
WI Administrative Code Website
City Municipal Zoning Code

What to Bring When You Apply For:

New Residential Construction
• Wisconsin Uniform Building Permit Application
• Erosion Control Permit
• Application for Building Permit
• Occupancy Permit Application
• Two (2) Copies of Plat of Survey
• Three (3) Sets of Architecturial Plans
• Heat Loss Calculation Sheet

 

New Commercial Construction
• Application for Building Permit
• Application for Review, Buildings, HVAC, and Components OCSBD-118
• Erosion Control Permit
• Occupancy Permit
• Two (2) Separate Copies of the Grading Plans
• For City reviewed Plans, 5 sets and 2 sets of Specifications and Calculations
• For State approved plans, 5 sets 2 of which have been stamped by the state
• For City reviewed HVAC plans, 3 sets, 3 sets of calculations designed either by the 2009 IECC or ASHRAE 90.1-2007 codes
• For State approved plans 3 sets, 2 of which have been stamped by the state and 2 sets of calculations

 

Shed, Fence or Swimming Pool
• Oak Creek Building Permit Application
• Plat of Survey
• Setback Information

 

Deck
• Oak Creek Building Permit Application
• Plat of Survey
• Setback Information
• Plans for the Deck

 

Garage
• Accessory Building Permit
• Plat of Survey
• Setback Information
• Plans or Detailed Information

 

Structure Additions
• Oak Creek Building Permit Application
• Plat of Survey (if adding on 1st Level)
• Two (2) Sets of Plans

 

Remodels / Rec Rooms
• Oak Creek Building Permit Application
• Projected Plans
• Information for Electrical Permit