City of Oak Creek
Common Council Report
Meeting Date: March 15, 2005
Item No.: 20
Recommendation: That the Common Council adopt Resolution No. 10489-031505, a resolution accepting the recommendations of the CIP Committee to authorize the road improvement projects listed below.
Background: The Engineering Department recently conducted its annual city-wide inspection, rating and rehabilitation cost analysis of the streets.
On March 2, 2005, the CIP Committee discussed the 2005 road improvement projects and recommended the following streets for rehabilitation under public contract. If bids come in favorable, all the listed streets could be completed. The Engineering Department would prepare the plans, specifications and bid documents.
|
Proposed Street |
From |
To |
Length (Feet) |
Treatment Type |
Cost Estimate* |
|
Hillview Ave. |
11th Ave. |
Cul-de-sac SE |
502 |
Resurfacing w/ Asphalt |
$70,000 |
|
Fitzsimmons Rd. (N. Side) |
Howell Ave. |
350 E. |
1,266 |
Resurfacing w/ Asphalt |
$28,000 |
|
Pennsylvania Ave. |
Drexel Ave. |
Forest Hill Ave. |
2,657 |
Resurfacing w/ Asphalt |
$101,000 |
|
Nicholson Rd. |
Oakwood Rd. |
Elm Rd. |
2,656 |
Resurfacing w/ Asphalt |
$110,000 |
|
Violet Dr. |
13th St. |
1600 W. |
1,137 |
Resurfacing w/ Asphalt |
$25,000 |
|
16th St. |
8700 S. |
8800 S. |
365 |
Resurfacing w/ Asphalt |
$8,000 |
|
15th St. |
Puetz Rd. |
Violet Dr. |
482 |
Resurfacing w/ Asphalt |
$11,000 |
|
Cedar St. |
2200 W. |
2000 W. |
727 |
Resurfacing w/ Asphalt |
$21,000 |
|
22nd St. |
Rawson Ave. |
Cedar St. |
491 |
Resurfacing w/ Asphalt |
$15,000 |
|
Rawson Ave. Service Road |
Rawson Ave. |
W. Of 22nd St. |
703 |
Resurfacing w/ Asphalt |
$15,000 |
|
Forest Hill Avenue |
Howell Ave. |
70’ w. of Howell |
70 |
Reconstruct w/ Asphalt |
$29,000 |
|
Depot Rd. |
5th Ave. |
E. End |
1,196 |
Resurfacing w/ Asphalt |
$51,000 |
|
Lakeside Ave. |
4000 E. |
E. End |
483 |
Resurfacing w/ Asphalt |
$13,000 |
|
Alley N. Of Maple St. |
6th Ave. |
W. End |
442 |
Resurfacing w/ Asphalt |
$11,000 |
|
Alley S. Of High St. |
6th Ave. |
High St. |
416 |
Resurfacing w/ Asphalt |
$6,000 |
|
Alley S. Of High St. |
5th Ave. |
6th Ave. |
542 |
Resurfacing w/ Asphalt |
$7,000 |
|
Alley S. Of Maple St. |
6th Ave. |
W. End |
418 |
Resurfacing w/ Asphalt |
$6,000 |
|
Alley S. Of Maple St. |
5th Ave. |
6th Ave. |
482 |
Resurfacing w/ Asphalt |
$6,000 |
|
Fitzsimmons Rd. |
Chicago Rd. |
E. End |
1,258 |
Resurfacing w/ Asphalt |
$33,000 |
|
American Ave. |
Chicago Rd. |
6th Ave. |
1,573 |
Resurfacing w/ Asphalt |
$49,000 |
|
5th Ave. |
N. City Limit |
Maple St. |
4,476 |
Resurfacing w/ Asphalt |
$185,000 |
|
TOTAL |
|
|
22,342 |
|
$800,000 |
*Estimate includes construction, inspection, engineering and administration costs
Fiscal Impact: Currently, there is approximately $287,000 in the “Unspecified Streets” control account left over from past paving projects and $500,000 budgeted for in the 2005 CIP, for a total of about $787,000 available for this year’s paving program.
|
Prepared by:
Michael C. Simmons, P.E. Construction Engineer |
Respectfully submitted:
Barbara S. Blumenfield, Ph.D. City Administrator
|
|
Approved by:
Wayne St. John, P.E. City Engineer |
|
|
Fiscal review by:
Beverly A. Buretta, CMC City Clerk |
|
BY: ___________________________________
RESOLUTION OF AUTHORIZATION TO PROCEED WITH
ROAD IMPROVEMENT PROJECTS
IN VARIOUS LOCATIONS
(PROJECT NOS. 05012 - 05018)
(VARIOUS ALDERMANIC DISTRICTS)
WHEREAS, in the judgment of the Common Council of the City of Oak Creek, it is deemed to be expedient and necessary and in the best interest of the City and the property affected thereby that the City proceed with the projects as follows:
|
Proposed Street |
From |
To |
Length (Feet) |
Treatment Type |
Cost Estimate* |
|
Hillview Ave. |
11th Ave. |
Cul-de-sac SE |
502 |
Resurfacing w/ Asphalt |
$70,000 |
|
Fitzsimmons Rd. (N. Side) |
Howell Ave. |
350 E. |
1,266 |
Resurfacing w/ Asphalt |
$28,000 |
|
Pennsylvania Ave. |
Drexel Ave. |
Forest Hill Ave. |
2,657 |
Resurfacing w/ Asphalt |
$101,000 |
|
Nicholson Rd. |
Oakwood Rd. |
Elm Rd. |
2,656 |
Resurfacing w/ Asphalt |
$110,000 |
|
Violet Dr. |
13th St. |
1600 W. |
1,137 |
Resurfacing w/ Asphalt |
$25,000 |
|
16th St. |
8700 S. |
8800 S. |
365 |
Resurfacing w/ Asphalt |
$8,000 |
|
15th St. |
Puetz Rd. |
Violet Dr. |
482 |
Resurfacing w/ Asphalt |
$11,000 |
|
Cedar St. |
2200 W. |
2000 W. |
727 |
Resurfacing w/ Asphalt |
$21,000 |
|
22nd St. |
Rawson Ave. |
Cedar St. |
491 |
Resurfacing w/ Asphalt |
$15,000 |
|
Rawson Ave. Service Road |
Rawson Ave. |
W. Of 22nd St. |
703 |
Resurfacing w/ Asphalt |
$15,000 |
|
Forest Hill Avenue |
Howell Ave. |
70’ w. of Howell |
70 |
Reconstruct w/ Asphalt |
$29,000 |
|
Depot Rd. |
5th Ave. |
E. End |
1,196 |
Resurfacing w/ Asphalt |
$51,000 |
|
Lakeside Ave. |
4000 E. |
E. End |
483 |
Resurfacing w/ Asphalt |
$13,000 |
|
Alley N. Of Maple St. |
6th Ave. |
W. End |
442 |
Resurfacing w/ Asphalt |
$11,000 |
|
Alley S. Of High St. |
6th Ave. |
High St. |
416 |
Resurfacing w/ Asphalt |
$6,000 |
|
Alley S. Of High St. |
5th Ave. |
6th Ave. |
542 |
Resurfacing w/ Asphalt |
$7,000 |
|
Alley S. Of Maple St. |
6th Ave. |
W. End |
418 |
Resurfacing w/ Asphalt |
$6,000 |
|
Alley S. Of Maple St. |
5th Ave. |
6th Ave. |
482 |
Resurfacing w/ Asphalt |
$6,000 |
|
Fitzsimmons Rd. |
Chicago Rd. |
E. End |
1,258 |
Resurfacing w/ Asphalt |
$33,000 |
|
American Ave. |
Chicago Rd. |
6th Ave. |
1,573 |
Resurfacing w/ Asphalt |
$49,000 |
|
5th Ave. |
N. City Limit |
Maple St. |
4,476 |
Resurfacing w/ Asphalt |
$185,000 |
|
TOTAL |
|
|
22,342 |
|
$800,000 |
*This estimate includes administration, engineering and inspection
and,
WHEREAS, the City Engineer has approved preliminary plans and specifications for said improvements.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oak Creek as follows:
1. That the aforementioned improvements be installed.
2. That payment for said improvements under be made from funds in the “Unspecified Streets” control account and C.I.P. funds reserved in the 2005 budget.
3. That the City Engineer is hereby authorized to approve final plans and specifications upon their completion.
4. That the City Clerk is hereby authorized to advertise for bids for said improvements and that she shall advertise for such bids in the official newspaper, the Western Builder and the Daily Reporter.
Introduced at a regular meeting of the Common Council of the City of Oak Creek held this 15th day of March 2005.
Passed and adopted this 15th day of March 2005.
_____________________________
President, Common Council
Approved this 15th day of March 2005.
_____________________________
Mayor
ATTEST:
_____________________________ VOTE: Ayes _______ Noes ________
City Clerk
T:\Shared\WPFILES\CCREPORT\2005\2005 CIP Recommendations.doc