Item No.:          11

Recommendation:  That the Common Council consider a motion to award the construction of the Shepard Hills Detention Basin Project, to the lowest responsive, responsible bidder, C.W. Purpero, Inc., in the estimated amount of $313,873.50 (Project No. 00037) (5th Aldermanic District).

 

Background:  The analysis of alternatives for resolving the flooding problems in the Shepard Hills area resulted in the recommendation of constructing a detention basin west of S. Shepard Avenue.  The detention basin should reduce upstream flooding by about 3 feet while reducing downstream peak flows by 20%.  The existing Quail Run detention basin will be expanded from its current surface area of 0.3 acres to a surface area of about 2.5 acres.  R.A. Smith and Associates prepared plans and specifications for the project, the work was advertised, and the following 13 bids were received.

 

Contractor

BID

C.W. Purpero, Inc.

$313,873.50

Sievert

$323,238.00

Mann Bros.

$342,464.60

Heitman

$344,235.00

Edgerton Contractors

$354,173.85

Berg Construction

$364,873.00

Willkomm Excavating

$372,786.28

James Cape & Sons

$388,099.00

Super Western

$391,579.00

A.W. Oakes & Sons

$408,613.00

New Berlin Grading

$416,550.50

Travis Brothers

$456,547.55

Gustafson

$585,950.00

                                   

This is a unit price bid.  Thus, bids were evaluated based on estimated quantities.

 

Fiscal Impact:  Payment for this project will be funded from Project No. 02034 – Unspecified Storm Water-1998 through 2002.

 

Prepared by:

 

Philip J. Beiermeister, P.E.

Environmental Design Engineer

 

 

Respectfully submitted,

 

 

Robert L. Kufrin

City Administrator

Approved By:

 

Wayne St. John, P.E.

Director of Public Works

Fiscal Review by:

 

 

Beverly A. Buretta, CMC

City Clerk

 

T:\Shared\WPFILES\CCREPORT\00037 Award.doc