NOTICE TO BIDDERS
|
OWNER |
The Common Council of the City of
|
|
|
PROJECT |
The work, officially known as
2005 Road Improvement Projects, consists of constructing the following
approximate quantities: |
|
|
item description |
Unit |
|
Saw Cut Asphalt Pavement |
3,345 LF
|
|
Saw Cut Concrete Pavement |
1,415 LF |
|
Remove Asphalt Pavement |
395 SY |
|
Remove Concrete Pavement |
2,270 SY |
|
Remove Curb & Gutter |
180 LF |
|
Remove and Replace Curb & Gutter |
260 LF |
|
Match Curb & Gutter |
42 EA |
|
Remove Asphalt Pavement, Milling 2”-3” |
8,520 SY |
|
Concrete Curb & Gutter |
170 LF |
|
Concrete Pavement, 5” |
19 SY |
|
|
3 EA |
|
Unclassified Excavation |
1,115 CY |
|
Undercut |
75 TON |
|
Crushed Aggregate Base Course |
1,230 TON |
|
Pulverize, Shape & Compact Asphalt Pavement |
52,535 SY |
|
Asphalt Pavement Base Repair |
1,005 SY |
|
Asphalt Binder |
8,565 TON |
|
Asphalt Surface |
4,400 TON |
|
Manhole Adjusting Ring |
32 EA |
|
Adjust Sanitary Manhole |
1 EA |
|
Stone Shoulder |
890 TON |
|
Seed Restoration |
840 SY |
|
Pavement Marking Epoxy 4” |
44,290 LF |
|
Pavement Marking Crosswalk Epoxy 6” |
470 LF |
|
Pavement Marking Channelizing Epoxy 8” |
47 LF |
|
Pavement
Marking Stop Line Epoxy 12” |
178 LF |
|
Pavement
Marking Diagonal Epoxy 12” |
90 LF |
|
Repair Storm Structure |
8 EA |
|
Remove & Replace Catch Basin |
1 EA |
|
Traffic Control, |
1 LS |
|
Replace Traffic Detector Loops, |
1 LS |
|
TIME |
Proposals must be received by the
City Clerk no later than |
|
CONTRACT DOCUMENTS |
Plans, specifications, and
bidding documents are on file for inspection at the City Engineer’s office, |
|
STATUTORY PROVISIONS |
The Contract letting shall be
subject to the provisions of Section 62.15, 66.0901, 66.0903, and 779.16
Wisconsin Statutes. The minimum wage
scale to be paid on this project shall be in accordance with the prevailing
minimum wage as determined by federal or state law, whichever applies, and
such wage is incorporated by reference, as it may be amended from time to
time. If the United States Department
of Housing and Urban Development or State of |
|
BID GUARANTEE |
A certified check or bank draft
payable to the City of Oak Creek, or a satisfactory bid bond, in an amount
not less than 5% of the bid shall accompany each bid as a guarantee that if
the bid is accepted, the bidder will execute and file the proposed contract
and bond within 10 days after the award of the contract. In case the bidder fails to file such
contract and bond within the time set by the City, the check or bid bond
shall be forfeited to the City as liquidated damages pursuant to SS.62.15(3). |
|
EQUAL OPPORTUNITY |
The City of Oak Creek hereby
notifies all bidders that it will affirmatively insure that in any contract
entered into pursuant to this advertisement, minority business enterprises
will be afforded full opportunity to submit bids in response to this
invitation and will not be discriminated against on the ground of race,
color, sex, or national origin in consideration for an award. |
|
BID REJECTION |
The Common Council reserves the
right to reject any and all bids, waive any |
|
BID WITHDRAWAL |
No bid shall be withdrawn for a
period of 30 days after the scheduled opening of the bids without the consent
of the Common Council. |
|
BIDDING DOCUMENTS AVAILABILITY |
Plans, specifications and bidding
documents shall be available at the City Engineer’s office on |
Published by the authority of the Common Council this 14th day of April, 2005.