NOTICE TO BIDDERS
|
OWNER |
The Common Council of the City of
|
|
|
PROJECT |
The work, officially known as
2006 Road Improvement Projects, consists of constructing the following
approximate quantities: |
|
|
item description |
Unit |
|
Saw Cut Asphalt Pavement |
360 LF
|
|
Saw Cut Concrete Pavement |
10,930 LF |
|
Remove Concrete Pavement |
20,015 SY |
|
Remove and Replace Curb & Gutter |
2,300 LF |
|
Match Curb & Gutter |
390 EA |
|
Concrete Curb & Gutter |
1,400 LF |
|
Concrete Curb & Gutter, Variable-head |
330 LF |
|
Unclassified Excavation |
3,985 CY |
|
Undercut |
505 TON |
|
Crushed Aggregate Base Course |
9,085 TON |
|
Pulverize, Shape & Compact Asphalt Pavement |
6,210 SY |
|
Asphalt, Type E-1 (19.0 mm) |
3,940 TON |
|
Asphalt, Type E-1 (12.5 mm) |
3,935 TON |
|
Stone Shoulder |
10 TON |
|
Seed Restoration |
2,115 SY |
|
Pavement Marking Epoxy 4” |
5,350 LF |
|
Pavement Marking Crosswalk Epoxy 6” |
1,910 LF |
|
Pavement Marking Stop Line Epoxy 12” |
170 LF |
|
Pavement Marking Railroad Crossings Epoxy |
2 EA |
|
Repair Storm Structure |
33 EA |
|
Adjust Storm Manhole |
2 EA |
|
Adjust Sanitary Manhole w/ External Seal |
2 EA |
|
|
1 LS |
|
Remove Concrete Base, 1.25’ Diameter |
7 EA |
|
Remove Concrete Base, 6.0’ Diameter |
2 EA |
|
Clearing & Grubbing |
610 SY |
|
Ditching |
125 LF |
|
Erosion Mat |
165 SY |
|
Silt Fence |
215 LF |
|
TIME |
Proposals must be received by the
City Clerk no later than 10:00 a.m., Friday, April 21, 2006, at which time
and place the proposals will be publicly opened and read aloud. |
|
CONTRACT DOCUMENTS |
Plans, specifications, and
bidding documents are on file for inspection at the City Engineer’s office, |
|
LRIP PROJECT |
One of the road segments to be
improved under this contract is a Local Road Improvement Project (LRIP). |
|
STATUTORY PROVISIONS |
The Contract letting shall be
subject to the provisions of Section 62.15, 66.0901, 66.0903, 144.06 and
779.16 Wisconsin Statutes. The minimum
wage scale to be paid on this project shall be in accordance with the
prevailing minimum wage as determined by federal or state law, whichever
applies, and such wage is incorporated by reference, as it may be amended
from time to time. If the United
States Department of Housing and Urban Development or State of |
|
BID GUARANTEE |
A certified check or bank draft
payable to the City of Oak Creek, or a satisfactory bid bond, in an amount
not less than 5% of the bid shall accompany each bid as a guarantee that if
the bid is accepted, the bidder will execute and file the proposed contract
and bond within 10 days after the award of the contract. In case the bidder fails to file such
contract and bond within the time set by the City, the check or bid bond
shall be forfeited to the City as liquidated damages pursuant to SS.62.15(3). |
|
EQUAL OPPORTUNITY |
The City of Oak Creek hereby
notifies all bidders that it will affirmatively insure that in any contract
entered into pursuant to this advertisement, minority business enterprises
will be afforded full opportunity to submit bids in response to this
invitation and will not be discriminated against on the ground of race,
color, sex, or national origin in consideration for an award. |
|
BID REJECTION |
The Common Council reserves the
right to reject any and all bids, waive any informalities in bidding, or to
accept the bid or bids, which best serves the interest of the City of Oak
Creek. |
|
BID WITHDRAWAL |
No bid shall be withdrawn for a
period of 30 days after the scheduled opening of the bids without the consent
of the Common Council. |
|
BIDDING DOCUMENTS AVAILABILITY |
Plans, specifications and bidding
documents shall be available at the City Engineer’s office on Thursday, April
6, 2006. |
Published by the authority of the Common Council this 6th
day of April, 2006.