NOTICE TO BIDDERS
|
OWNER |
The Common Council of the City of
|
|
|
PROJECT |
The work, officially known as
Project No. 04003 – Road Reconstruction in |
|
|
item description |
Unit |
|
Saw Cut Asphalt Pavement |
980 LF
|
|
Saw Cut Concrete Pavement |
100 LF |
|
Remove Asphalt Pavement |
1,225 SY |
|
Remove Concrete Pavement |
185 SY |
|
Remove Curb & Gutter |
135 LF |
|
Unclassified Excavation |
5,075 CY |
|
Pulverize, Shape & Compact Asphalt Pavement |
26,725 SY |
|
Undercut |
2,670 TON |
|
Curb & Gutter, 31” Vertical Face |
12,240 LF |
|
Curb & Gutter, 36” Mountable |
90 LF |
|
Tie Bars |
132 EA |
|
Open-graded Base Course |
2,790 TON |
|
Crushed Aggregate Base Course |
890 TON |
|
4” Perforated Underdrain |
9,940 LF |
|
Underdrain Connection to Curb Inlet |
43 EA |
|
Asphalt Binder |
7,560 TON |
|
Asphalt Surface |
2,520 TON |
|
Concrete Approach, 7” |
35 SY |
|
Remove Junction Box |
1 EA |
|
Remove Street Light |
5 EA |
|
Junction Box |
5 EA |
|
Street Light, Single Fixture |
2 EA |
|
Street Light, Double Fixture |
6 EA |
|
Cable-in-duct |
1,320 LF |
|
2” PVC Conduit |
855 LF |
|
Relocate Hydrant |
1 EA |
|
Extend Hydrant Lead |
1 EA |
|
Adjust Valve Box |
9 EA |
|
Adjust Sanitary Manhole, External Seal |
9 EA |
|
Adjust Sanitary Manhole, Bolt-down Frame |
9 EA |
|
Sanitary Manhole Alteration |
1 EA |
|
Adjust Storm Structure |
37 EA |
|
Storm Inlet Casting |
14 EA |
|
Storm Manhole Casting |
2 EA |
|
Manhole Adjusting Ring |
21 EA |
|
Repair Storm Structure |
8 EA |
|
Remove Inlet |
9 EA |
|
Catch Basin |
17 EA |
|
Storm Manhole |
2 EA |
|
10” PVC Storm Sewer, Granular Backfill |
11 LF |
|
12” HDPE Storm Sewer, Granular Backfill |
20 LF |
|
12” RCP Storm Sewer, Granular Backfill |
370 LF |
|
15” RCP Storm Sewer, Granular Backfill |
80 LF |
|
15” RCP Storm Sewer, Spoil Backfill |
83 LF |
|
Connect to
Existing Storm Structure |
20 EA
|
|
Hydrodynamic
Separator |
1 LS |
|
Replace 24” Culvert, Granular Backfill |
115 LF |
|
24” RC
Flared End Section |
2 EA |
|
Pavement Marking, Stop Line, 12”, Epoxy |
67 LF
|
|
Pavement Marking, 4”, Epoxy |
9,875 LF
|
|
Fill Material, Medians |
610 CY |
|
Seed Restoration |
12,815 SY |
|
Traffic Control |
1 LS |
|
TIME |
Proposals must be received by the
City Clerk no later than |
|
CONTRACT DOCUMENTS |
Plans, specifications, and
bidding documents are on file for inspection at the City Engineer’s office, |
|
STATUTORY PROVISIONS |
The Contract letting shall be
subject to the provisions of Section 62.15, 66.0901, 66.0903, and 779.16
Wisconsin Statutes. The minimum wage
scale to be paid on this project shall be in accordance with the prevailing
minimum wage as determined by federal or state law, whichever applies, and
such wage is incorporated by reference, as it may be amended from time to
time. If the United States Department
of Housing and Urban Development or State of |
|
BID GUARANTEE |
A certified check or bank draft
payable to the City of Oak Creek, or a satisfactory bid bond, in an amount
not less than 5% of the bid shall accompany each bid as a guarantee that if
the bid is accepted, the bidder will execute and file the proposed contract
and bond within 10 days after the award of the contract. In case the bidder fails to file such
contract and bond within the time set by the City, the check or bid bond
shall be forfeited to the City as liquidated damages pursuant to SS.62.15(3). |
|
EQUAL OPPORTUNITY |
The City of Oak Creek hereby
notifies all bidders that it will affirmatively insure that in any contract
entered into pursuant to this advertisement, minority business enterprises
will be afforded full opportunity to submit bids in response to this
invitation and will not be discriminated against on the ground of race,
color, sex, or national origin in consideration for an award. |
|
BID REJECTION |
The Common Council reserves the
right to reject any and all bids, waive any |
|
BID WITHDRAWAL |
No bid shall be withdrawn for a
period of 30 days after the scheduled opening of the bids without the consent
of the Common Council. |
|
BIDDING DOCUMENTS AVAILABILITY |
Plans, specifications and bidding
documents shall be available at the City Engineer’s office on |
Published by the authority of the Common Council this 26th
day of May, 2005.