| PROJECT NO. 04003 - SOUTHBRANCH RECONSTRUCTION |
|
|
|
|
|
|
|
|
|
| Bid
Date: June 10, 2005 |
|
|
Payne & Dolan |
|
| Item |
|
|
|
Unit |
Total |
|
| No. |
Item Description |
Quantity |
|
Price |
Price |
|
| 1 |
Saw cut asphalt pavement |
980 |
LF |
$0.85 |
$833.00 |
|
| 2 |
Saw cut concrete pavement |
100 |
LF |
$1.85 |
$185.00 |
|
| 3 |
Remove asphalt pavement |
1,225 |
SY |
$2.50 |
$3,062.50 |
|
| 4 |
Remove concrete pavement |
185 |
LF |
$11.80 |
$2,183.00 |
|
| 5 |
Remove curb & gutter |
135 |
LF |
$10.10 |
$1,363.50 |
|
| 6 |
Unclassified excavation |
5,075 |
CY |
$18.70 |
$94,902.50 |
|
|
| 7 |
Pulverize, shape & compact
asphalt |
28,500 |
SY |
$1.96 |
$55,860.00 |
|
|
| 8 |
Undercut |
950 |
TON |
$19.95 |
$18,952.50 |
|
|
| 9 |
Curb & Gutter, 31"
Vertical Face |
12,240 |
LF |
$10.75 |
$131,580.00 |
|
|
| 10 |
Curb & Gutter, 36"
Mountable |
90 |
LF |
$14.70 |
$1,323.00 |
|
|
| 11 |
Tie Bars |
144 |
EA |
$5.00 |
$720.00 |
|
|
| 12 |
Open-graded Base
Course |
2,790 |
TON |
$13.60 |
$37,944.00 |
|
|
| 13 |
Crushed Aggregate Base Course |
2,500 |
TON |
$11.95 |
$29,875.00 |
|
|
| 14 |
4" Perforated Underdrain |
9,200 |
LF |
$5.00 |
$46,000.00 |
|
|
| 15 |
Underdrain Core Connection to
Existing Curb Inlet |
23 |
EA |
$98.50 |
$2,265.50 |
|
|
|
| 16 |
Asphalt Binder |
7,780 |
TON |
$29.90 |
$232,622.00 |
|
|
| 17 |
Asphalt Surface |
2,600 |
TON |
$36.30 |
$94,380.00 |
|
|
| 18 |
Concrete
Approach, 7" |
35 |
SY |
$40.50 |
$1,417.50 |
|
|
| 19 |
Remove Junction Box |
1 |
EA |
$200.00 |
$200.00 |
|
|
|
| 20 |
Remove Street Light |
5 |
EA |
$300.00 |
$1,500.00 |
|
|
|
| 21 |
Junction Box |
5 |
EA |
$400.00 |
$2,000.00 |
|
|
|
| 22 |
Street Light, Single Fixture |
2 |
EA |
$1,735.00 |
$3,470.00 |
|
|
|
| 23 |
Street Light, Dual Fixture |
6 |
EA |
$2,030.00 |
$12,180.00 |
|
|
|
| 24 |
Cable-in-duct |
1320 |
LF |
$4.05 |
$5,346.00 |
|
|
|
| 25 |
2" PVC Conduit |
855 |
LF |
$3.80 |
$3,249.00 |
|
|
|
| 26 |
Relocate Hydrant |
2 |
EA |
$7,150.00 |
$14,300.00 |
|
|
|
| 27 |
Adjust Valve Box |
9 |
EA |
$118.91 |
$1,070.19 |
|
|
|
| 28 |
Adjust Sanitary Manhole,
External Seal |
9 |
EA |
$850.00 |
$7,650.00 |
|
|
|
| 29 |
Adjust Sanitary Manhole,
Bolt-down Frame |
9 |
EA |
$1,150.00 |
$10,350.00 |
|
|
|
| 30 |
Sanitary Manhole Alteration |
1 |
EA |
$2,200.00 |
$2,200.00 |
|
|
|
| 31 |
Adjust Storm Structure |
37 |
EA |
$575.00 |
$21,275.00 |
|
|
|
| 32 |
Storm Inlet Casting |
14 |
EA |
$375.00 |
$5,250.00 |
|
|
|
| 33 |
Storm Manhole Casting |
2 |
EA |
$460.00 |
$920.00 |
|
|
|
| 34 |
Manhole Adjusting Ring |
21 |
EA |
$100.00 |
$2,100.00 |
|
|
|
| 35 |
Repair Storm Structure |
8 |
EA |
$435.00 |
$3,480.00 |
|
|
|
| 36 |
Remove Inlet |
9 |
EA |
$300.00 |
$2,700.00 |
|
|
|
| 37 |
Catch Basin |
17 |
EA |
$1,550.00 |
$26,350.00 |
|
|
|
| 38 |
Storm Manhole |
2 |
EA |
$1,600.00 |
$3,200.00 |
|
|
|
| 39 |
10" PVC Storm Sewer,
Granular Backfill |
11 |
LF |
$37.00 |
$407.00 |
|
|
|
| 40 |
12" HDPE Storm Sewer,
Granular Backfill |
20 |
LF |
$50.00 |
$1,000.00 |
|
|
|
| 41 |
12" RCP Storm Sewer,
Granular Backfill |
370 |
LF |
$70.00 |
$25,900.00 |
|
|
|
| 42 |
15" RCP Storm Sewer,
Granular Backfill |
80 |
LF |
$75.00 |
$6,000.00 |
|
|
|
| 43 |
15" RCP Storm Sewer, Spoil
Backfill |
83 |
LF |
$70.00 |
$5,810.00 |
|
|
|
| 44 |
Connect to Existing Storm
Structure |
20 |
EA |
$350.00 |
$7,000.00 |
|
|
|
| 45 |
Hydrodynamic Separtor |
1 |
LS |
$55,554.00 |
$55,554.00 |
|
|
|
| 46 |
Replace 24" Culvert |
115 |
LF |
$97.00 |
$11,155.00 |
|
|
|
| 47 |
24" RC Flared End Section |
2 |
EA |
$650.00 |
$1,300.00 |
|
|
|
| 48 |
Storm Inlet Sediment Protection |
1 |
LS |
$1,000.00 |
$1,000.00 |
|
|
|
| 49 |
Connect to Existing Storm
Structure |
20 |
EA |
$350.00 |
$7,000.00 |
|
|
|
| 50 |
Pavement Marking, Stop Line,
12", Epoxy |
67 |
LF |
$4.00 |
$268.00 |
|
|
|
| 51 |
Pavment Marking, 4" Epoxy |
9875 |
LF |
$0.42 |
$4,147.50 |
|
|
|
| 52 |
Seed Restoration |
12815 |
SY |
$3.03 |
$38,829.45 |
|
|
|
| 53 |
Traffic Control |
1 |
LS |
$18,200.00 |
$18,200.00 |
|
|
|
| |
TOTAL |
|
|
|
$1,067,830.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|